Effinature × BREEAM LE
BREEAM – Land Use & Ecology (LE)
Compared with BREEAM – Land Use & Ecology (LE), Effinature covers the applicable biodiversity criteria as follows: NCO 8/9, EVO 8/9, HOR 7/9, HVE 6/9. The remaining Effinature criteria go beyond this framework's biodiversity scope.
With Effinature certification, you already meet BREEAM LE
The Effinature NCO reference covers 8/9 of BREEAM LE's applicable biodiversity criteria — and documents 40 additional criteria that BREEAM LE does not require.
Inverse coverage per Effinature reference
Share of this framework's applicable biodiversity criteria covered by each Effinature reference. "And more" = Effinature criteria beyond the framework's scope.
Detailed correspondences (59)
| Framework provision | Effinature criterion | Relation | Confidence | Rationale |
|---|---|---|---|---|
| LE01 Site selection — reuse of previously developed land and remediation of contaminated land (conscious siting) |
EFF-C-054
Land use
|
Close match | High (85%) | L'occupation du sol Effinature caractérise l'usage antérieur (imperméabilisé/friche) et oriente le choix vers des terrains déjà artificialisés, cœur de LE01. |
| LE01 Site selection — reuse of previously developed land and remediation of contaminated land (conscious siting) |
EFF-C-052
Initial soil state
|
Related match | Medium (70%) | L'état initial du sol documente la nature/qualité du terrain support, prérequis pour évaluer la réutilisation d'un terrain développé/contaminé. |
| LE01 Site selection — reuse of previously developed land and remediation of contaminated land (conscious siting) |
EFF-C-080
Initial state of pollution
|
Related match | Medium (70%) | L'état initial des pollutions correspond à l'investigation de contamination exigée pour valoriser un terrain à dépolluer sous LE01. |
| LE01 Site selection — reuse of previously developed land and remediation of contaminated land (conscious siting) |
EFF-C-115
Pollution treatment and risk prevention
|
Related match | Medium (65%) | Le traitement des pollutions et prévention des risques recoupe la remédiation d'un site contaminé récompensée par LE01. |
| LE01 Site selection — reuse of previously developed land and remediation of contaminated land (conscious siting) |
EFF-C-028
Soil preservation
|
Related match | Medium (60%) | La préservation des sols traduit l'intention de réemployer/valoriser un support existant plutôt que d'artificialiser un terrain vierge. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-072
Fauna analysis
|
Close match | High (85%) | L'analyse de la faune (état initial par écologue) établit la valeur écologique du site exigée par LE02. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-059
Flora analysis
|
Close match | High (85%) | L'analyse de la flore établit la valeur écologique végétale, composante directe de l'évaluation LE02. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-061
Ecological continuities and habitat characterisation
|
Close match | High (80%) | Continuités écologiques et caractérisation des habitats = cartographie des habitats et zone d'influence attendues sous LE02. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-073
Initial fauna state
|
Close match | High (80%) | L'état initial faune constitue le relevé de terrain (survey) requis par l'écologue qualifié. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-060
Initial flora state
|
Close match | High (80%) | L'état initial de la flore est le relevé baseline flore de LE02. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-019
Assessment of ecological continuities and habitat characterisation
|
Close match | High (80%) | L'évaluation des continuités écologiques et caractérisation des habitats (HOR) correspond à l'identification des enjeux/opportunités écologiques. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-070
Environmental impact assessment
|
Related match | Medium (70%) | L'évaluation des incidences environnementales recoupe l'analyse des risques et opportunités écologiques (GN34). |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-120
Training and accreditation of the Biodiversity Partner
|
Related match | Medium (70%) | La formation et l'agrément du Biodiversity Partner correspondent à l'exigence d'écologue qualifié (SQE) menant l'évaluation. |
| LE02 Ecological value of site — assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species) |
EFF-C-010
Needs assessment
|
Related match | Medium (60%) | L'évaluation des besoins cadre l'analyse préalable des enjeux écologiques du site. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-108
Fauna preservation
|
Close match | High (85%) | La préservation de la faune traduit la protection des espèces/habitats retenus durant le développement. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-100
Preservation of the initial plant heritage
|
Close match | High (85%) | La préservation du patrimoine végétal initial correspond à la protection des features écologiques retenues (LE03). |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-010
Needs assessment
|
Close match | Medium (75%) | L'évaluation des besoins (volet ERC) instaure la séquence Éviter-Réduire-Compenser au cœur de LE03. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-101
Site installation plan (PIC) – flora component
|
Close match | High (80%) | Le PIC volet flore protège la végétation retenue pendant le chantier (zones racinaires, balisage). |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-111
Site installation plan (PIC) – fauna component
|
Close match | High (80%) | Le PIC volet faune organise la protection de la faune sur le chantier (pratiques de construction sensibles). |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-051
Low-nuisance worksite
|
Close match | Medium (75%) | Le chantier à faibles nuisances met en œuvre des pratiques de construction protégeant l'écologie du site. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-014
Derogation for works during a sensitive period
|
Related match | Medium (70%) | La dérogation de travaux en période sensible protège la faune nicheuse pendant les phases critiques. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-013
Limiting the crushing of microfauna
|
Related match | Medium (65%) | Limiter l'écrasement de la microfaune relève des mesures de minimisation des impacts chantier. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-109
Preventive measures
|
Related match | Medium (65%) | Les mesures de prévention réduisent les atteintes à la faune, conformes à la hiérarchie d'atténuation. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-025
Earthworks / land-clearing operations method
|
Related match | Medium (60%) | La méthode des opérations de terrassement/défrichement encadre la minimisation des impacts sur habitats. |
| LE03 Managing negative impacts on ecology — mitigation hierarchy, protection of retained features during construction |
EFF-C-102
Discovery of invasive alien plant species (EVEE) during works
|
Related match | Medium (60%) | La gestion des EVEE en phase chantier évite la dégradation écologique par espèces envahissantes. |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-063
Plant palette
|
Close match | High (85%) | La palette végétale (locale/indigène) est le levier direct d'enrichissement écologique récompensé par LE04. |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
|
Close match | High (85%) | La mise en œuvre d'un Espace de Biodiversité Structuré crée de nouveaux habitats, cœur de l'enhancement LE04. |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-062
Areas set aside for biodiversity
|
Close match | High (80%) | Les espaces sanctuarisés pour la biodiversité augmentent la valeur écologique du site. |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-066
Building greening
|
Close match | Medium (75%) | La végétalisation du bâti ajoute des surfaces d'habitat, contribuant au gain écologique. |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-076
Evidence in favour of biodiversity
|
Close match | Medium (75%) | Les témoins en faveur de la biodiversité (gîtes, nichoirs) constituent des mesures d'amélioration écologique. |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-064
Choice of the plant palette
|
Related match | Medium (70%) | Le choix de la palette végétale oriente vers des essences favorables à la biodiversité (enhancement). |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-007
IVS determination
|
Related match | Medium (65%) | La détermination de l'IVS mesure la valeur végétale support de l'amélioration écologique visée. |
| LE04 Ecological change and enhancement — increase in ecological value (native planting, habitat creation, biodiversity net gain) |
EFF-C-021
Greening and buildings
|
Related match | Medium (65%) | Végétalisation et bâti augmentent la surface écologiquement fonctionnelle. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-065
Plant-heritage management plan
|
Close match | High (85%) | Le plan de gestion du patrimoine végétal est l'équivalent direct du Landscape & Ecology Management Plan (LEMP). |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-069
Sustainable management of plant heritage
|
Close match | High (80%) | La gestion durable du patrimoine végétal formalise l'entretien écologique long terme exigé par LE05. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-043
Overall intervention schedule
|
Close match | Medium (75%) | Le planning global d'intervention structure les rôles et le calendrier de gestion, composante du LEMP. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-044
Fauna monitoring
|
Close match | Medium (75%) | Le suivi de la faune fournit le monitoring/KPI de la gestion écologique long terme. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-037
Flora monitoring
|
Close match | Medium (75%) | Le suivi de la flore alimente le monitoring de l'état écologique dans le temps. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-031
Management of plant heritage
|
Close match | Medium (70%) | La gestion du patrimoine végétal (HVE) opérationnalise le plan de gestion écologique. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-124
Effinature ecological assessment – End of operation
|
Close match | Medium (70%) | Le bilan écologique Effinature fin d'opération assure le reporting/KPI du LEMP. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-035
Specific management of the Structured Biodiversity Area (EBS)
|
Related match | Medium (65%) | La gestion spécifique de l'EBS relève du plan de gestion écologique long terme. |
| LE05 Long term ecology management and maintenance — Landscape & Ecology Management Plan (LEMP), roles, KPIs |
EFF-C-033
Mowing of green spaces
|
Related match | Medium (60%) | La fauche des espaces verts est une prescription d'entretien écologique du LEMP. |
| LE06 Change in ecological value — quantified calculation (GN36) of biodiversity value pre/post development |
EFF-C-036
Update of the Ecological Value Index (IVE management)
|
Close match | High (80%) | L'actualisation de l'IVE (Indice de la Valeur Écologique) quantifie l'évolution de la valeur écologique, comparable au GN36. |
| LE06 Change in ecological value — quantified calculation (GN36) of biodiversity value pre/post development |
EFF-C-099
Update of the CBSh (harmonised Biotope Area Factor)
|
Close match | Medium (75%) | L'actualisation du CBSh mesure l'évolution du potentiel biotope du site (proxy quantitatif de valeur écologique). |
| LE06 Change in ecological value — quantified calculation (GN36) of biodiversity value pre/post development |
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
|
Close match | Medium (75%) | L'actualisation de l'ITCE quantifie l'évolution de la cohérence écologique pré/post projet. |
| LE06 Change in ecological value — quantified calculation (GN36) of biodiversity value pre/post development |
EFF-C-004
Harmonised Biotope Area Factor (CBSh)
|
Related match | Medium (65%) | Le CBSh (état initial) fournit la valeur de référence pour mesurer le changement écologique. |
| LE06 Change in ecological value — quantified calculation (GN36) of biodiversity value pre/post development |
EFF-C-024
Update of the district CBSh (harmonised Biotope Area Factor – district)
|
Related match | Medium (60%) | L'actualisation du CBSh Quartier étend la mesure du changement à l'échelle du quartier. |
| LE06 Change in ecological value — quantified calculation (GN36) of biodiversity value pre/post development |
EFF-C-123
Estimate of investments in favour of biodiversity
|
Related match | Indicative (55%) | L'estimation des investissements en faveur de la biodiversité accompagne la quantification du gain écologique. |
| POL04 Reduction of night-time light pollution — external lighting strategy limiting obtrusive/upward light (CIE 150-2003 / ILP GN01), switch-off controls |
EFF-C-081
Reduction of light nuisance
|
Close match | High (85%) | La réduction des nuisances lumineuses correspond directement à l'objectif de POL04 (limitation de la lumière intrusive/ascendante). |
| POL04 Reduction of night-time light pollution — external lighting strategy limiting obtrusive/upward light (CIE 150-2003 / ILP GN01), switch-off controls |
EFF-C-082
Assessment of outdoor-lighting needs
|
Close match | High (80%) | L'évaluation des besoins en éclairage extérieur = démarche de conception d'une stratégie d'éclairage maîtrisée (POL04). |
| POL04 Reduction of night-time light pollution — external lighting strategy limiting obtrusive/upward light (CIE 150-2003 / ILP GN01), switch-off controls |
EFF-C-048
Outdoor lighting
|
Close match | Medium (75%) | L'éclairage extérieur (HVE) encadre l'exploitation de l'éclairage conformément aux exigences de réduction de pollution lumineuse. |
| POL03 Flood risk management and reducing surface water run-off — SuDS, attenuation, no increase in post-development run-off |
EFF-C-068
Sustainable stormwater management
|
Close match | High (85%) | La gestion durable des eaux pluviales (infiltration, gestion à la source) correspond aux techniques SuDS exigées par POL03. |
| POL03 Flood risk management and reducing surface water run-off — SuDS, attenuation, no increase in post-development run-off |
EFF-C-018
Stormwater management along roads
|
Close match | Medium (75%) | La gestion des eaux pluviales le long des voiries met en œuvre des dispositifs SuDS (noues) limitant le ruissellement. |
| POL03 Flood risk management and reducing surface water run-off — SuDS, attenuation, no increase in post-development run-off |
EFF-C-067
Water-resource management plan
|
Related match | Medium (70%) | Le plan de gestion de la ressource en eau intègre la maîtrise du ruissellement pluvial. |
| POL03 Flood risk management and reducing surface water run-off — SuDS, attenuation, no increase in post-development run-off |
EFF-C-042
Integrity check of stormwater-harvesting systems
|
Related match | Indicative (55%) | Le contrôle de l'intégrité des dispositifs de récupération des eaux pluviales assure la pérennité des ouvrages SuDS. |
| WAT01 Water consumption — reduction of potable water use (efficient fittings, metering) |
EFF-C-038
Reasonable water use
|
Close match | Medium (75%) | L'utilisation raisonnée de l'eau vise la réduction de la consommation, objectif de WAT01. |
| WAT01 Water consumption — reduction of potable water use (efficient fittings, metering) |
EFF-C-039
Water-resource optimisation report
|
Related match | Medium (65%) | Le rapport d'optimisation de la ressource en eau documente les économies de consommation. |
| WAT01 Water consumption — reduction of potable water use (efficient fittings, metering) |
EFF-C-040
Watering technique
|
Related match | Medium (60%) | La technique d'arrosage économe réduit la consommation d'eau des espaces verts. |
| WAT01 Water consumption — reduction of potable water use (efficient fittings, metering) |
EFF-C-041
Meter readings
|
Related match | Indicative (55%) | Le relevé des compteurs correspond au metering exigé pour le suivi de consommation (WAT01). |
Source & licence
- Publisher : IRICE (groupe NORMAXIS)
- Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012) — scope at www.cofrac.fr
- Dataset version : 9.1
- Licence : CC BY-ND 4.0