Effinature × LEED-ND
LEED for Neighborhood Development (ND)

Compared with LEED for Neighborhood Development (ND), Effinature covers the applicable biodiversity criteria as follows: NCO 4/23, EVO 5/23, HOR 2/23, HVE 1/23. The remaining Effinature criteria go beyond this framework's biodiversity scope.

With Effinature certification, you already meet LEED-ND

The Effinature EVO reference covers 5/23 of LEED-ND's applicable biodiversity criteria — and documents 0 additional criteria that LEED-ND does not require.

Comparable frameworks Label / certification International BRE / USGBC Official source ↗

Inverse coverage per Effinature reference

Share of this framework's applicable biodiversity criteria covered by each Effinature reference. "And more" = Effinature criteria beyond the framework's scope.

NCO
4/23
EVO
5/23
HOR
2/23
HVE
1/23

Detailed correspondences (68)

Framework provision Effinature criterion Relation Confidence Rationale
SLL-P4
Agricultural Land Conservation
EFF-C-003
Soil quality
Related match Indicative (45%) LEED protege les terres agricoles de qualite (sols de valeur) ; Effinature EFF-C-003 vise la qualite du sol du site. Recouvrement partiel sur la valeur des sols.
SLL-P4
Agricultural Land Conservation
EFF-C-054
Land use
Related match Indicative (40%) Occupation/consommation du sol ; LEED evite l'artificialisation des terres agricoles a l'echelle quartier.
SLL-C2
Brownfield Remediation
EFF-C-003
Soil quality
Related match Indicative (50%) Brownfield Remediation traite la depollution des sols contamines, recouvrant l'exigence de qualite du sol (EFF-C-003) pour les sites pollues.
SLL-C2
Brownfield Remediation
EFF-C-115
Pollution treatment and risk prevention
Related match Indicative (50%) Traitement des pollutions et prevention des risques (EFF-C-115) - LEED cible la depollution des friches avant amenagement.
SLL-C2
Brownfield Remediation
EFF-C-080
Initial state of pollution
Related match Indicative (40%) Etat initial des pollutions (EFF-C-080) - la remediation LEED s'appuie sur un diagnostic (Phase II ESA) de contamination.
SLL-C4
Steep Slope Protection
EFF-C-006
Combating soil sealing and heat islands
Related match Indicative (40%) Steep Slope Protection limite l'artificialisation/erosion des pentes ; lien partiel avec la lutte contre l'impermeabilisation des sols (EFF-C-006).
SLL-C4
Steep Slope Protection
EFF-C-028
Soil preservation
Related match Indicative (40%) Preservation des sols (EFF-C-028) - LEED protege les sols en pente contre l'erosion et la degradation.
GIB-C5
Minimized Site Disturbance
EFF-C-028
Soil preservation
Close match Medium (60%) Minimized Site Disturbance preserve les sols et la vegetation existants hors emprise - correspond a la Preservation des sols (EFF-C-028).
GIB-C5
Minimized Site Disturbance
EFF-C-098
Soil preservation
Related match Indicative (50%) Preservation du sol en phase chantier (EFF-C-098) via la limitation de l'emprise perturbee.
GIB-C5
Minimized Site Disturbance
EFF-C-100
Preservation of the initial plant heritage
Related match Indicative (55%) Preservation du patrimoine vegetal initial (EFF-C-100) - GIB-C5 protege la vegetation native existante.
GIB-C5
Minimized Site Disturbance
EFF-C-011
Site installation plan (PIC) – soil component
Related match Indicative (40%) Plan d'installation de chantier volet sol (EFF-C-011) - LEED delimite les zones a ne pas perturber.
SS-P1
Construction Activity Pollution Prevention
EFF-C-011
Site installation plan (PIC) – soil component
Related match Indicative (50%) PIC volet sol (EFF-C-011) - la prevention de la pollution chantier LEED impose des mesures de protection du sol et anti-erosion.
SS-P1
Construction Activity Pollution Prevention
EFF-C-051
Low-nuisance worksite
Related match Indicative (50%) Chantier a faibles nuisances (EFF-C-051) - controle de l'erosion, sedimentation et poussieres pendant le chantier.
SS-P1
Construction Activity Pollution Prevention
EFF-C-114
Worksite monitoring
Related match Indicative (40%) Suivi de chantier (EFF-C-114) - LEED exige un plan de controle de la pollution en phase travaux.
SS-P1
Construction Activity Pollution Prevention
EFF-C-115
Pollution treatment and risk prevention
Related match Indicative (40%) Traitement des pollutions et prevention des risques (EFF-C-115) en phase chantier.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-072
Fauna analysis
Related match Indicative (50%) Analyse de la faune (EFF-C-072) - le prerequis LEED impose la conservation des especes menacees identifiees par un biologiste.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-074
Fauna preservation programme
Related match Indicative (50%) Programme de preservation de la faune (EFF-C-074) - evitement/protection des habitats d'especes menacees.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-108
Fauna preservation
Related match Indicative (50%) Preservation de la faune (EFF-C-108) - conservation des especes et communautes ecologiques en peril.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-070
Environmental impact assessment
Related match Indicative (40%) Evaluation des incidences environnementales (EFF-C-070) - LEED evalue et evite les impacts sur les especes menacees.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-062
Areas set aside for biodiversity
Related match Indicative (45%) Espaces sanctuarises pour la biodiversite (EFF-C-062) - le prerequis LEED sanctuarise les habitats d'especes en peril.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-062
Areas set aside for biodiversity
Close match Medium (60%) Site Design for Habitat conserve et sanctuarise l'habitat significatif via zones tampons - correspond aux Espaces sanctuarises (EFF-C-062).
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-019
Assessment of ecological continuities and habitat characterisation
Related match Indicative (45%) Evaluation des continuites ecologiques et caracterisation des habitats (EFF-C-019) - LEED fait delimiter les habitats par un biologiste.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-061
Ecological continuities and habitat characterisation
Related match Indicative (45%) Continuites ecologiques et caracterisation des habitats (EFF-C-061) - delimitation de l'habitat significatif et de ses tampons.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-074
Fauna preservation programme
Related match Indicative (40%) Programme de preservation de la faune (EFF-C-074) - conception du site pour conserver l'habitat faune.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-108
Fauna preservation
Related match Indicative (40%) Preservation de la faune (EFF-C-108) via la protection de l'habitat en conception.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-100
Preservation of the initial plant heritage
Related match Indicative (40%) Preservation du patrimoine vegetal initial (EFF-C-100) - conservation des plantes indigenes.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
Related match Indicative (50%) Mise en oeuvre d'un Espace de Biodiversite Structure (EFF-C-103) - restauration d'habitats indigenes sur une part de l'emprise.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-063
Plant palette
Related match Indicative (50%) Palette vegetale (EFF-C-063) - LEED restaure avec des plantes indigenes uniquement.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-064
Choice of the plant palette
Related match Indicative (50%) Choix de la palette vegetale (EFF-C-064) - restauration par especes indigenes representatives.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-020
Spontaneous flora
Related match Indicative (40%) Flore spontanee (EFF-C-020) - restauration des communautes vegetales predeveloppement.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-105
Choice, quality and provenance of plants
Related match Indicative (40%) Choix, qualite et provenance des vegetaux (EFF-C-105) - usage exclusif de plantes indigenes en restauration.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-065
Plant-heritage management plan
Close match Medium (60%) Plan de gestion du patrimoine vegetal (EFF-C-065) - LEED impose un plan de gestion long terme (>=10 ans) des habitats.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-069
Sustainable management of plant heritage
Related match Indicative (50%) Gestion durable du patrimoine vegetal (EFF-C-069) - plan de gestion long terme finance.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-035
Specific management of the Structured Biodiversity Area (EBS)
Related match Indicative (45%) Gestion specifique de l'Espace de Biodiversite Structure (EFF-C-035) - gestion conservatoire long terme des habitats.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-044
Fauna monitoring
Related match Indicative (40%) Suivi de la faune (EFF-C-044) - le plan LEED prevoit un suivi/evaluation par un biologiste.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-037
Flora monitoring
Related match Indicative (40%) Suivi de la flore (EFF-C-037) - suivi ecologique dans le plan de gestion long terme.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-123
Estimate of investments in favour of biodiversity
Related match Indicative (40%) Estimation des investissements en faveur de la biodiversite (EFF-C-123) - LEED exige une source de financement garantie pour la gestion.
NPD-C13
Tree-Lined and Shaded Streetscapes
EFF-C-017
Open-ground reservoir for street-alignment trees
Related match Indicative (50%) Reservoir de pleine terre pour les arbres d'alignement (EFF-C-017) - LEED plante des arbres d'alignement le long des rues.
NPD-C13
Tree-Lined and Shaded Streetscapes
EFF-C-031
Management of plant heritage
Related match Indicative (35%) Gestion du patrimoine vegetal (EFF-C-031) - developpement d'un couvert arbore de rue.
SLL-P3
Wetland and Water Body Conservation
EFF-C-068
Sustainable stormwater management
Related match Indicative (40%) Gestion durable des eaux pluviales (EFF-C-068) - la conservation des zones humides/masses d'eau maintient les fonctions hydrologiques.
SLL-P3
Wetland and Water Body Conservation
EFF-C-019
Assessment of ecological continuities and habitat characterisation
Related match Indicative (35%) Evaluation des continuites et habitats (EFF-C-019) - LEED caracterise les fonctions des zones humides/masses d'eau (habitat, qualite d'eau).
SLL-P3
Wetland and Water Body Conservation
EFF-C-062
Areas set aside for biodiversity
Related match Indicative (40%) Espaces sanctuarises (EFF-C-062) - zones humides et tampons non perturbees et proteges pour conservation.
SLL-P5
Floodplain Avoidance
EFF-C-068
Sustainable stormwater management
Related match Indicative (35%) Gestion durable des eaux pluviales (EFF-C-068) - l'evitement des zones inondables preserve les fonctions hydrologiques et de retention.
SS-C1
Rainwater Management
EFF-C-068
Sustainable stormwater management
Close match Medium (65%) Rainwater Management par infrastructures vertes/LID correspond directement a la Gestion durable des eaux pluviales (EFF-C-068).
SS-C1
Rainwater Management
EFF-C-067
Water-resource management plan
Related match Indicative (45%) Plan de gestion de la ressource en eau (EFF-C-067) - gestion des eaux pluviales a la source.
SS-C1
Rainwater Management
EFF-C-018
Stormwater management along roads
Related match Indicative (45%) Gestion des eaux pluviales le long des voiries (EFF-C-018) - LID/noues LEED le long des espaces.
SS-C1
Rainwater Management
EFF-C-006
Combating soil sealing and heat islands
Related match Indicative (40%) Lutte contre l'impermeabilisation (EFF-C-006) - LEED limite les surfaces impermeables et infiltre a la source.
SS-C1
Rainwater Management
EFF-C-042
Integrity check of stormwater-harvesting systems
Related match Indicative (30%) Controle de l'integrite des dispositifs de recuperation des eaux pluviales (EFF-C-042) - LEED gere l'eau via des ouvrages dedies.
WE-C2
Outdoor Water Use Reduction
EFF-C-038
Reasonable water use
Related match Indicative (50%) Utilisation raisonnee de l'eau (EFF-C-038) - Outdoor Water Use Reduction reduit l'eau potable d'arrosage.
WE-C2
Outdoor Water Use Reduction
EFF-C-040
Watering technique
Related match Indicative (45%) Technique d'arrosage (EFF-C-040) - efficacite de l'irrigation et choix de plantes peu gourmandes.
WE-C2
Outdoor Water Use Reduction
EFF-C-022
Green-space watering technique
Related match Indicative (45%) Technique d'arrosage des espaces verts (EFF-C-022) - reduction de l'eau exterieure via irrigation efficiente.
WE-C2
Outdoor Water Use Reduction
EFF-C-039
Water-resource optimisation report
Related match Indicative (40%) Rapport d'optimisation de la ressource en eau (EFF-C-039) - optimisation de l'eau des espaces verts.
WE-P1
Indoor Water Use Reduction
EFF-C-038
Reasonable water use
Related match Indicative (30%) Utilisation raisonnee de l'eau (EFF-C-038) - reduction de la consommation d'eau (ici interieure), recouvrement partiel.
WE-C1
Indoor Water Use Reduction
EFF-C-039
Water-resource optimisation report
Related match Indicative (30%) Rapport d'optimisation de la ressource en eau (EFF-C-039) - reductions additionnelles de consommation d'eau.
GIB-C9
Wastewater Management
EFF-C-067
Water-resource management plan
Related match Indicative (30%) Plan de gestion de la ressource en eau (EFF-C-067) - reutilisation/traitement des eaux usees sur site (broad).
SS-C2
Heat Island Reduction
EFF-C-006
Combating soil sealing and heat islands
Close match Medium (60%) Heat Island Reduction correspond a la Lutte contre l'impermeabilisation des sols et les ilots de chaleur (EFF-C-006).
SS-C2
Heat Island Reduction
EFF-C-021
Greening and buildings
Related match Indicative (45%) Vegetalisation et bati (EFF-C-021) - toitures/facades vegetalisees pour reduire l'ilot de chaleur.
SS-C2
Heat Island Reduction
EFF-C-066
Building greening
Related match Indicative (40%) Vegetalisation du bati (EFF-C-066) - toitures vegetalisees comptabilisees dans la reduction d'ilot de chaleur.
SS-C3
Light Pollution Reduction
EFF-C-081
Reduction of light nuisance
Close match Medium (60%) Light Pollution Reduction correspond a la Reduction des nuisances lumineuses (EFF-C-081), protection de la faune nocturne.
SS-C3
Light Pollution Reduction
EFF-C-082
Assessment of outdoor-lighting needs
Related match Indicative (45%) Evaluation des besoins en eclairage exterieur (EFF-C-082) - LEED limite l'uplight/trespass en dimensionnant l'eclairage.
SS-C3
Light Pollution Reduction
EFF-C-048
Outdoor lighting
Related match Indicative (40%) Eclairage exterieur (EFF-C-048) - reduction de la pollution lumineuse.
NPD-C12
Local Food Production
EFF-C-119
Feeding areas
Related match Indicative (50%) Espaces nourriciers (EFF-C-119) - Local Food Production soutient jardins/agriculture urbaine et production alimentaire locale.
NPD-C8
Access to Civic and Public Space
EFF-C-089
Social bond and awareness
Related match Indicative (30%) Lien social et sensibilisation (EFF-C-089) - acces aux espaces publics/parcs favorise le lien social.
NPD-C8
Access to Civic and Public Space
EFF-C-090
Strengthening social bonds
Related match Indicative (30%) Renforcement du lien social (EFF-C-090) via l'acces aux espaces publics et parcs.
NPD-C11
Community Outreach and Involvement
EFF-C-090
Strengthening social bonds
Related match Indicative (35%) Renforcement du lien social (EFF-C-090) - concertation et implication des habitants.
NPD-C11
Community Outreach and Involvement
EFF-C-049
Awareness-raising meeting
Related match Indicative (30%) Reunion de sensibilisation (EFF-C-049) - implication communautaire dans la conception.
GIB-C11
Solid Waste Management
EFF-C-116
Waste-management programme
Related match Indicative (40%) Programme de gestion des dechets (EFF-C-116) - Solid Waste Management prevoit tri/recyclage/compostage.
GIB-C11
Solid Waste Management
EFF-C-104
Green-waste management
Related match Indicative (30%) Gestion des dechets verts (EFF-C-104) - infrastructure de compostage prevue par LEED.

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012) — scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0